Skip to content
Munisa Resources DealRoom
Back to marketplace
GoldTantaliteOutright sale· DR-07

Gold mine with milling plant, Murehwa — Mashonaland East (165 ha)

A 165 ha brownfield gold property near Murehwa with a milling plant on site, 434 m of trenching and 944 m of 2026 diamond drilling. Best reported intercept 4.0 m at 18.31 g/t Au.

Processing plant: jaw crusher, conveyor and round mill

Photos supplied by the holder. People’s faces are blurred; the precise site is shared after the NDA.

Title type
Not yet supplied
Size
165 ha
Province
Mashonaland East
Verification
Tier 0, Unverified

Where the project stands

  1. Prospect
  2. Exploration
  3. Permitting
  4. Development
  5. Production

Development. Shafts, pits or a plant on site; not yet in steady production.

Overview

A brownfield gold property of about 165 ha in Murehwa District, Mashonaland East, around 125 km north-east of Harare, offered as a 100% share sale of the holding company. Gold is hosted in sheared quartz-mica schist with quartz vein systems carrying pyrite, arsenopyrite and chalcopyrite; the reports describe two sub-parallel veins about 4 m apart that merge at depth and a pay shoot of around 210 m plunging steeply north-east. A 2026 exploration programme cut 11 trenches (434 m) and drilled six diamond holes (944 m); results reported for two of the holes include 4.0 m at 18.31 g/t Au and 1.97 m at 9.07 g/t from 234–246 m depth, and trench channels returned mostly 0.3–3.8 g/t. Laboratory certificates have not yet been supplied and the two supplied reports differ in places, so these are exploration results only and not a resource statement. The site has a diesel-powered milling plant with round mills, a jaw crusher and conveyor, leach tanks, an office, workshop and storeroom, a steel headgear over old workings and flooded open pits. The holding also includes a tantalite base-mineral block. Registration certificates and confirmation that gold rights cover the drilled zone are outstanding, which is why this listing sits at Tier 0. Site inspection, including the stored drill core, is arranged through the desk.

Highlights

  • 165 ha brownfield gold property, Murehwa District, ~125 km from Harare
  • Milling plant on site: round mills, jaw crusher, conveyor and leach tanks
  • 2026 diamond drilling (944 m) and trenching (434 m)
  • Best reported drill intercept: 4.0 m at 18.31 g/t Au
  • Shear-hosted quartz-vein gold; tantalite block also held
  • 100% share sale of the holding company

Figures are as reported by the holder. They are not a resource or reserve statement and have not been independently measured by the desk. See the verification tier for how far checks have gone.

Geology and development

Development stage: brownfield

Surveys and work reported

Geological mappingTrenching / pittingDiamond drilling (DD)

Due diligence checklist

2 of 6 on file

What the desk holds for this listing today. Items on file are shared under NDA; requested items are being collected from the holder. See how we verify.

  • Title certificatePartly supplied
  • Current inspection certificateRequested from the holder
  • Beacon coordinates / surveyOn file with the desk
  • Laboratory assaysPartly supplied
  • Geological reportOn file with the desk
  • Environmental (EMA) certificateRequested from the holder

Documents on file

1 item

The desk holds the title and technical documents for this claim and sends them to you directly once an NDA is signed.

  • PDFTechnical summary
    After NDA

Exact locality and coordinates

The precise site and coordinates are held server-side and released only after the NDA. The teaser shows Mashonaland East by design.

Related claims

All Gold claims
GoldJoint venture

Gold processing hub, 100 tonnes a day CIL — Hurungwe

A hub-and-spoke gold processing venture: toll milling and carbon-in-leach recovery from small-scale miners' ore and tailings, with gold sold through the group's licensed buyer.

Tier 0 · Unverified
Province
Mashonaland West
MMM-AU-HUB1Updated today
View asset
GoldOutright sale+ Joint venture

Green Rose gold mine, Hurungwe — Mashonaland West (113 ha)

A brownfield gold mine in trial mining near Karoi, where 14–16 g/t gold has been mined at 28–42 m, offered for outright purchase or a 50/50 joint venture.

Tier 0 · UnverifiedRegistered
Grade
14–16 g/t
Title type
Registered claim
Size
113 ha
Province
Mashonaland West
Stage
Brownfield

Development stage: Development

MMM-AU-H01Updated today
View asset
GoldOutright sale

Gold block, Shamva — Mashonaland Central (340 ha)

An undeveloped 340 ha gold block in the Shamva gold field of the Harare–Bindura–Shamva greenstone belt, offered for outright sale.

Tier 0 · Unverified
Size
340 ha
Province
Mashonaland Central
Stage
Greenfield

Development stage: Prospect

DR-10Updated 1 week ago
View asset