Skip to content
Munisa Resources DealRoom
Back to marketplace
ChromeOutright saleRegistered· MMM-CHR-G01

Chrome claim, Guruve — Snake Head, Great Dyke

High-grade chrome ground on the Great Dyke Snake Head sub-chamber, ~186 ha, opencast potential.

Title type
Special grant
Size
186 ha
Province
Mashonaland Central
Verification
Tier 0, Unverified

Where the project stands

  1. Prospect
  2. Exploration
  3. Permitting
  4. Development
  5. Production

Exploration. Mapping, sampling, trenching or drilling under way or completed.

Overview

Chrome claim on the Snake Head sub-chamber of the Great Dyke, Guruve–Dande area, Mashonaland Central. Approx. 186 ha, offered for outright sale. Surface samples grade 40–51% Cr2O3 (avg ~45%), Cr:Fe ~2.5–3, with potential for chrome seams 1–2, mineable by opencast. Technical detail available under NDA.

Highlights

  • Great Dyke, Snake Head sub-chamber — high-grade chrome ground
  • Sampled grades 40–51% Cr2O3 (avg ~45%), Cr:Fe ~2.5–3
  • Opencast potential on chrome seams 1–2
  • Part of a contiguous 3-claim block (~591 ha) — available individually or as a package; JV considered

Technical

Grade
40–51 %
Reef strike
3 km

Figures are as reported by the holder. They are not a resource or reserve statement and have not been independently measured by the desk. See the verification tier for how far checks have gone.

Geology and development

Development stage: greenfield

Surveys and work reported

Geological mappingRock-chip / grab sampling

Due diligence checklist

2 of 3 on file

What the desk holds for this listing today. Items on file are shared under NDA; requested items are being collected from the holder. See how we verify.

  • Title certificateRequested from the holder
  • Laboratory assaysOn file with the desk
  • Geological reportOn file with the desk

Documents on file

The desk holds the title and technical documents for this claim and sends them to you directly once an NDA is signed.

Nothing is listed here yet. Ask the desk what is on file for MMM-CHR-G01 and we will tell you before you sign anything.

Exact locality and coordinates

The precise site and coordinates are held server-side and released only after the NDA. The teaser shows Mashonaland Central by design.

Related claims

All Chrome claims
ChromeOutright sale+ Joint venture, Toll processing

Chrome blocks, Great Dyke — Shurugwi–Lalapanzi, Midlands (six blocks, 598 ha)

Six chrome blocks totalling about 598 ha on the Great Dyke's Midlands chrome field, close to four ferrochrome smelters — suited to a smelter owner or an integrated ore-to-alloy investor.

Tier 0 · UnverifiedRegistered
Title type
Registered claim
Size
598 ha
Blocks
6 blocks
Province
Midlands

Development stage: Exploration

MMM-CHR-L01Updated today
View asset
ChromeOutright sale

Registered chrome claim, Mberengwa (138 ha)

138 ha registered chrome claim in Mberengwa producing lumpy ore, with independent laboratory assays available.

Tier 1 · Documents sightedRegistered
Grade
33.4–48.2 %
Title type
Registered claim
Size
138 ha
Province
Midlands

Development stage: Production

MMM-CHR-M01Updated 1 week ago
View asset