Granite quarry blocks, Greater Harare (64 ha, three blocks)
Three pegged granite quarry blocks in the Greater Harare construction corridor, seeking a partner for a crushing plant, fleet and ready-mix concrete.
- Title type
- Registered claim
- Size
- 64 ha
- Province
- Harare
- Verification
- Tier 0, Unverified
Where the project stands
- Prospect
- Exploration
- Permitting
- Development
- Production
Permitting. Environmental and mining permits being obtained for development.
Overview
Three pegged granite quarry blocks totalling about 64 ha in Harare South and south-east, 7–17 km from Robert Gabriel Mugabe International Airport, inside a major project corridor. They are held through Kenmil Civil Infrastructure, the group's construction arm, which would supply granite to a partner-owned plant under a long-term agreement. Greater Harare needs an estimated 0.9–1.55 million m³ of aggregate a year. The partner would bring a crushing plant, extraction fleet and haul trucks, optionally with ready-mix concrete batching and a brick line, structured as toll crushing, an equipment lease or a ready-mix concrete joint venture. An Environmental Impact Assessment and change of land use are under way, with Kenmil managing the Environmental Management Agency and council approvals; a reserve survey is pending. Kenmil reports the same structure already signed with an international partner in August 2026. Figures are management estimates. Block diagrams and certificates, the quarry financial model and a Greater Harare market study are released once your NDA is executed.
Highlights
- Three pegged quarry blocks, about 64 ha, Greater Harare
- 7–17 km from Robert Gabriel Mugabe International Airport
- Greater Harare needs 0.9–1.55 million m³ of aggregate a year
- EIA and change of land use under way
- The partner brings the plant; Kenmil supplies the granite
- Open to toll crushing, an equipment lease or a ready-mix concrete JV
Figures are as reported by the holder. They are not a resource or reserve statement and have not been independently measured by the desk. See the verification tier for how far checks have gone.
Due diligence checklist
0 of 4 on fileWhat the desk holds for this listing today. Items on file are shared under NDA; requested items are being collected from the holder. See how we verify.
- Title certificateRequested from the holder
- Beacon coordinates / surveyRequested from the holder
- Geological reportRequested from the holder
- Environmental (EMA) certificatePartly supplied
Documents on file
The desk holds the title and technical documents for this claim and sends them to you directly once an NDA is signed.
Nothing is listed here yet. Ask the desk what is on file for MMM-GRN-H01 and we will tell you before you sign anything.
Exact locality and coordinates
The precise site and coordinates are held server-side and released only after the NDA. The teaser shows Harare by design.
