Skip to content
Munisa Resources DealRoom
Back to marketplace
GoldOutright sale· DR-05

Gold mine with processing plant, Mazowe — Mashonaland Central (200 ha, 20 blocks)

An operating 200 ha, 20-block gold mine in Mazowe with a milling plant, settling ponds and two working shafts on a multi-reef shear-zone system. Sale or joint venture.

Processing plant: hopper and cyclone tower, mills and feed conveyor

Photos supplied by the holder. People’s faces are blurred; the precise site is shared after the NDA.

Title type
Not yet supplied
Size
200 ha
Province
Mashonaland Central
Verification
Tier 0, Unverified

Where the project stands

  1. Prospect
  2. Exploration
  3. Permitting
  4. Development
  5. Production

Production. Ore is being mined or processed (holder-reported unless stated).

Overview

An operating gold mine of 20 blocks, about 200 ha, in Mazowe District, Mashonaland Central, around 45 km north-west of Harare in the Harare–Bindura–Shamva greenstone belt, offered for outright sale with a joint venture also open for discussion. The holder reports a processing plant on site — photographs show a hopper and cyclone tower, ball mills, a feed conveyor, circular settling ponds and sand dumps, with grid power nearby — about 25 staff, two working shafts of 12 m and 15 m, open cuts in oxidised ground and exploration trenches. Gold occurs in an imbricate system of more than twelve narrow, sulphide-bearing shear-zone reefs in granodiorite and meta-basalt, with scheelite noted as an accessory mineral. Holder-reported grades include about 0.76 g/t from shaft sampling at 15 m, around 8 g/t over 0.6 m on contact-zone splays and a 2–3 g/t average, and the holder reports 5 kg and 3 kg of gold produced from the two current reefs; none of these figures is backed yet by laboratory certificates or production records, and none is a resource statement. A geology report and a 2017 ground magnetic survey covering part of the property are on file. Registration certificates for the 20 blocks and proof of the seller's authority are outstanding, which is why this listing sits at Tier 0. Site inspection, including sampling in both shafts, is arranged through the desk.

Highlights

  • Operating mine: milling plant, settling ponds and about 25 staff (holder-reported)
  • 200 ha across 20 gold blocks, Mazowe District, ~45 km from Harare
  • Two working shafts (12 m and 15 m) plus open cuts and trenches
  • More than 12 shear-zone reefs identified
  • Holder-reported production of 5 kg and 3 kg from the current reefs; no assay certificates yet
  • Outright sale; joint venture also considered

Figures are as reported by the holder. They are not a resource or reserve statement and have not been independently measured by the desk. See the verification tier for how far checks have gone.

Geology and development

Development stage: brownfield

Surveys and work reported

Geological mappingTrenching / pittingMagnetic surveyInduced polarisation (IP) surveySoil geochemistry

Due diligence checklist

2 of 7 on file

What the desk holds for this listing today. Items on file are shared under NDA; requested items are being collected from the holder. See how we verify.

  • Title certificateRequested from the holder
  • Current inspection certificateRequested from the holder
  • Beacon coordinates / surveyOn file with the desk
  • Laboratory assaysRequested from the holder
  • Geological reportOn file with the desk
  • Environmental (EMA) certificateRequested from the holder
  • Seller's mandate to sellRequested from the holder

Documents on file

5 items

The desk holds the title and technical documents for this claim and sends them to you directly once an NDA is signed.

  • PDFTechnical summary
    After NDA
  • PDFGround magnetic survey report (2017)
    After NDA
  • PDFTechnical summary — mine and plant
    After NDA
  • PDFGeology and orebody report
    After NDA
  • XLSXCorner coordinates for all 20 blocks
    After NDA

Exact locality and coordinates

The precise site and coordinates are held server-side and released only after the NDA. The teaser shows Mashonaland Central by design.

Related claims

All Gold claims
GoldJoint venture

Gold processing hub, 100 tonnes a day CIL — Hurungwe

A hub-and-spoke gold processing venture: toll milling and carbon-in-leach recovery from small-scale miners' ore and tailings, with gold sold through the group's licensed buyer.

Tier 0 · Unverified
Province
Mashonaland West
MMM-AU-HUB1Updated today
View asset
GoldOutright sale+ Joint venture

Green Rose gold mine, Hurungwe — Mashonaland West (113 ha)

A brownfield gold mine in trial mining near Karoi, where 14–16 g/t gold has been mined at 28–42 m, offered for outright purchase or a 50/50 joint venture.

Tier 0 · UnverifiedRegistered
Grade
14–16 g/t
Title type
Registered claim
Size
113 ha
Province
Mashonaland West
Stage
Brownfield

Development stage: Development

MMM-AU-H01Updated today
View asset
GoldTantaliteOutright sale

Gold mine with milling plant, Murehwa — Mashonaland East (165 ha)

A 165 ha brownfield gold property near Murehwa with a milling plant on site, 434 m of trenching and 944 m of 2026 diamond drilling. Best reported intercept 4.0 m at 18.31 g/t Au.

Tier 0 · Unverified
Size
165 ha
Province
Mashonaland East
Stage
Brownfield

Development stage: Development

DR-07Updated 1 week ago
View asset